Home
About Us
General News
Current Construction
Current Filming
CC&R's
By-Laws & Articles
The Herald
Contact Us
Forms
The Forms Page
Includes:
* ARC Requirements & App
* Film Rules & App
* Dog Tag App
* Park Use and Rental Rules

    

H P P O C
 

        The Huntington Palisades Property Owners Corporation, Inc.

Construction within our community

Address

Description

Approved Date

601 Alma Real

Exterior & Re-Roofing 10/6/06
     
700 Alma Real New single family residence 12/22/05
707 Alma Real Remodel to SFR 7/11/07
     
     
     
14948 Altata New two-story SFR w/basement & garage 5/31/07
     
15001 Altata Addition of 500 SF. 11/15/05
     
14930 Alva Addition of 278 sq. ft. 7/28/05
     
14900 Camarosa Addition to existing home 7/25/07
14948 Camarosa Addition of bedroom, bath & remodel Kitchen 2/16/08
     
     
 

 

390 Chautauqua Two-Story Addition to W. side of existing home 3/15/07
   

 

652 Chautauqua New 2-story residence. 5/18/04
     
14868 & 14880 CDM New one-story SFR w/Basement 10/8/07
14984 Corona del Mar Remodel & addition 5/31/07(approved minus Dormers)
14984 Corona del Mar Dormer Vents 2/21/08
15045 Corona del Mar New Two-Story w/attached garage 2/22/07
15060 Corona del Mar New Garage & Pool Cabana  
549 Frontera Garage Expansion 7/11/07
622 Frontera 2nd story addition and remodel 11/6/06
14909 La Cumbre New SFR 4/9/07
508 Ocampo New SFR 3/23/07
714 Ocampo New Two-Story SFR w/attached garage & basement 6/15/07 (as noted)
747 Ocampo 2-story SFR 10/18/06
     
777 Ocampo Addition to 1st & 2nd floors 2/1/07
257 Toyopa New SFR w/ basement 11/14/07
458 Toyopa New SFR 5/11/06
511 Toyopa Pool, outdoor canopy, roof canopy, BBQ & driveway replacement 5/2/07
551Toyopa New Two-Story SFR 4/19/07
650 Toyopa Additions to SFR 8/3/06
     
800 Toyopa 1st & 2nd story remodel/additions 2/22/07
844 Toyopa New Two-Story & basement SFR 2/15/08

 

 

 

© System Interface Consultants 2005                 Web Design by System Interface Consultants